Alberta, Canada

Status

Under Construction

Year

2024

Owned Capacity

1,332

MW

Owned/Operated

100/100

Natural Gas
Free roulette casino games
Status
Under Construction
Year

2024

Owned Capacity

1,332

MW

OWNED/OPERATED

100/100

Natural Gas
play roulette games

We are repowering Genesee 1 & 2 to natural gas combined cycle (NGCC) generation units from coal-fired units. Located entirely within the footprint of the existing Genesee Generating Station, the repowering project involves installing two new Mitsubishi M501JAC gas-fired combustion turbines and Vogt triple-pressure heat recovery steam generators, free online roulette games while utilizing the unit’s existing steam turbine generators.

The two repowered units will provide an additional 512 megawatts (MW) of net capacity totaling 1,332 MW. The repowered assets will utilize Best online live roulette Best-in-class NGCC technology and are expected to set a new standard for gas generation efficiency in Canada.

Current
G1/2 combined
Repowering
G1/2 combined
Total
G1/2
Net Capacity 820MW 512MW 1,332MW

Construction activity began in 2021 and is anticipated to create ~900 people years of construction work with a peak forecast of ~500 workers.

Genesee 1 & 2 are both scheduled to become dedicated NGCC units in 2024 which will take Capital Power off coal. Both units will be converted to run in simple cycle mode before the completion of the repowering of each unit.

Quick Facts

  • Additional 512 MW of net capacity
  • Carbon capture ready
  • Best online live roulette Best-in-class NGCC technology making Genesee 1 & 2 the most efficient NGCC units in Canada
  • Providing reliable and cost-effective energy while contributing to a 40% reduction in emissions from the Genesee site
  • ~60% decrease in carbon emissions intensity from ~0.93 tonnes of CO2e per MWh when burning coal to 0.36 tonnes CO2e per MWh
  • Over 80% decrease in NOx emissions intensity
  • At least 50% water usage reduction for the repowered units

Consultation and Engagement

We value and consider local community interests and priorities. We engage government, employees, local communities, investors, stakeholders, and Indigenous communities. Our goal for every project, every facility and every initiative, internal and external, is to build, operate, and align with the interests and priorities of those closest to, and most impacted by, our live roulette Operations. Please reach out to us anytime with your questions or comments about the project by:

Free roulette casino games 1-855-703-5005
Email: [email protected]
Mail:
Genesee Repowering Project
C/O Stakeholder Engagement
Capital Power
10th Floor EPCOR Tower
10423 101 Street NW
Edmonton, AB T5H 0E9